Canary_Yellow
Journeyman Pro
Had two quotes for some work on my roof and struggling to reconcile them.
Quote 1: roofer went up there and took a look, and gave detailed run down of the work to be done.
A few different bits, none of it major. 1 day’s work for two people, £900
Quote 2 : inspected the inside of the loft, inspected the roof from ground level. Didn’t feel the need to go up there and look as whatever the issue, he thought it would be one day’s work, £480.
I’m a bit nervous that the second quote might end up being a bit more of a patch up job and less thorough, but equally, a bit concerned the first one is expensive.
Given the importance of a roof, I want this dealt with in one go and not end up with it being an ongoing saga!
Anyone got any thoughts? I suppose the obvious answer really is to make sure they’re both quoting for exactly the same thing.
Quote 1: roofer went up there and took a look, and gave detailed run down of the work to be done.
A few different bits, none of it major. 1 day’s work for two people, £900
Quote 2 : inspected the inside of the loft, inspected the roof from ground level. Didn’t feel the need to go up there and look as whatever the issue, he thought it would be one day’s work, £480.
I’m a bit nervous that the second quote might end up being a bit more of a patch up job and less thorough, but equally, a bit concerned the first one is expensive.
Given the importance of a roof, I want this dealt with in one go and not end up with it being an ongoing saga!
Anyone got any thoughts? I suppose the obvious answer really is to make sure they’re both quoting for exactly the same thing.